Date of starting: 2005, Open to traffic: 2008, Total
value: Rs. 81.50 cr. (appx)
Type: Rail Bridge, Supply Fabrication & Erection
Salient features: Length: 2100m, Span: 32x64.6m, Steel Work:
8500 mt. (appx)
Fabrication and Erection of 32 Nos 64.6 M spans over river Mahanadi in connection with Doubling of Talcher-Cuttack-Paradip section of Odissa