Some of the recent civil engineering projects are :
Date of starting:- 2003, Open to traffic :- 2005, Total value:- Rs. 18.23 cr. (appx)
Type:- Metro Rail Bridge Over a Road Flyover, Supply Fabrication & Erection
Salient features:- Span- 60m, Steel Work- 525 mt. (appx)
Challenges during construction:- The total erection was carried out over rail track without disturbing the rail movemen
Date of starting:- 2003, Open to traffic :- 2005, Total value:- Rs. 21.26 cr. (appx)
Type:- Metro Rail Bridge Over a Road Flyover, Supply Fabrication & Erection
Salient features:- Span- 60m, Steel Work- 525 mt. (appx)
Challenges during construction :- The total erection was carried out at night keeping the traffic flow
Date of starting:- 2010, Open to traffic :- 2013, Total value:- Rs. 21.16 cr. (appx)
Type:- Double Track Rail Bridge, Supply Fabrication & Erection
Salient features:- Span- 3x61m, Steel Work- 1300 mt. (appx)
Challenges during construction :- Erection was done at one of the busiest station of Mumbai (Andheri) over the running railway tracks with keeping undisturbed movement of trains.
Construction of intake jetty, raw water pumping station, electrical sub-station, suction main, delivery main etc. at Dakshin Raipur, Nodakhali, Budge Budge, West Bengal.